0
bln ֏

Investments already implemented

0
+

Employees in the company

0

Countries in the freight network

0
km

Repaired railway lines

Ենթակառուցվածք

Infrastructure Modernization

About 70% of the investments have been directed towards improving safety and infrastructure. Currently, there are no sections with unsatisfactory ratings on the Armenian railways.

  • 3 new main bridges were built (Zamanlu, Satani, Kober-Tumanyan).
  • More than 1 million sleepers have been replaced, of which 540,000 are reinforced concrete.
  • Yerevan, Gyumri, and Vanadzor stations have been completely renovated.
  • A 135 km long fiber-optic communication line (Sevan-Zod) has been laid.
Շարժակազմ

Renewal of Rolling Stock and Depots

Since 2017, a large-scale rolling stock renewal program has been launched, ensuring comfortable and safe traffic.

  • The newest EP2D electric trains have been acquired for suburban routes.
  • Modern rolling stock for international passenger transportation was purchased in 2021.
  • The locomotive and wagon depots of Gyumri have been completely renovated.
Բեռնափոխադրումներ

Logistics and Freight Transportation

Actively expanding international ties, the Company carries out freight transportation to 75 countries worldwide.

  • Cargo transit time has been reduced by 2 times.
  • The "Poti - Karmir Blur" accelerated container train is successfully operating.
  • A state-of-the-art customs and logistics terminal has been established in Yerevan.
Ուղևորափոխադրումներ

Passenger Transportation and Innovation

Extensive work has been done to improve the quality of passenger service, ensuring stable annual growth.

  • There are 2 branded international trains operating to Tbilisi and Batumi.
  • The travel time of the Yerevan-Batumi route has been reduced by 6 hours.
  • The "Orion" ticket sales system has been introduced, reducing service time from 10 to 2 minutes.